Quote:
|
Originally Posted by Nighthawk
cool, you shouldn't need 8 people. I think with 2 people a lift and the right tools it should take about 20 min to do a mid pipe.
|
okay then
Me, nighthawk and JMG right? I'd prefer to get this done early if at all possible since i want to go to MM and the shootathon on the same day i think they open at 9 so lets get there at 10 sound good everyone?